21年项目管理师考试答案5章 第1章


39 Charisma would be an example of _____ power.

A. Legitimate

B. Reward

C. Coercive

D. Expert

E.Referent

正确答案:E


In which type of organization is team building likely to be most difficult?

A . Functional

B . Projectized

C . Matrixed

D . Project expediter

E . Project coordinator

正确答案:C


In which of the following scope management processes are subject matter experts used?

A . Initiation

B . Scope planning

C . Scope Definition

D . Scope change control

E . Scope verification

正确答案:A


3 Using the WBS in the Special window, an instance of a work package is:

A. Build house

B. Excavate

C. Prepare Foundation

D. B and C

E. None of the above

正确答案:E


● In crashing a task, you would focus on:

A As many tasks as possible.

B Non critical tasks.

C Accelerating performance of tasks on critical path.

D Accelerate performance by minimizing cost.

E A and D.

正确答案:C


21年项目管理师考试答案5章 第2章


Participative Management:

A involves the solicitation of information from all team members.

B assumes that members avoid work and responsibility.

C suggests the sharing of power and decision making.

D employs a Theory X style. of leadership.

E A and C

正确答案:E


85 A team that is just forming needs:

A. An organization chart

B. Alternatives and choices

C. Structure and specificity

D. Orientation and organization

E. Opportunities for dialogue and conflict resolution

正确答案:C


了解Halo效应非常重要,因为有这样一种趋势:( )

A.内部提拔

B.聘用最优秀的

C.把人员调进项目管理层,因为他擅长各自的技术领域

D.把人员调进项目管理层,因为他接受过项目管理培训

正确答案:C


组织政策和哲学的陈述,职位说明和限制条件说明是以下什么的例子?( )

A.从上至下的交流

B.横向沟通

C.外部沟通

D.平级沟通

正确答案:A


项目范围控制管理描述了如何使用指导和监督来控制项目范围。下面哪个任务不是在该管理过程中执行的内容?

A、确认一个条目或一个系统的功能和物理特征

B、针对特性控制变更

C、对项目范围进行审核以检验当前的项目范围是否与预定的要求相符

D、允许对变更的自动承认

正确答案:D


21年项目管理师考试答案5章 第3章


在哪一个项目阶段进行最终的项目预算?

A、 启动阶段

B、 在项目生命期开始前交给项目经理

C、 计划编制阶段

D、 执行阶段

正确答案:C


在项目工作网络中有几种类型的浮动期。那些在特定活动中使用并且不影响后来活动的浮动期被称作

A、多余的浮动期

B、自由的浮动期

C、总的浮动期

D、预期的浮动期

正确答案:B


项目干系人包括:

A、 终端用户

B、 供货商

C、 市民

D、 以上都是

正确答案:D


164 In communications management, to assimilate through the mind or senses (as in new ideas) is the process of

A. Understanding

B. Communicating

C. Receiving

D. Decoding

E. Comprehending

正确答案:C


在什么情况下,重新制定基准计划可以成为成本控制的一个输出?( )

A.出现严重成本偏差,必须采取实际的执行措施

B.修订的成本估算已经准备好并且发布给项目干系人

C.必须采取纠错行动,达到符合项目计划的预期未来绩效

D.A和C

正确答案:A


21年项目管理师考试答案5章 第4章


项目小组衡量风险应对计划实施的有效性时将计划实施结果与下列哪个因素对比的结果:

A、可接受的临界风险

B、风险评分

C、风险的概率/影响评级

D、项目的总体风险评级

正确答案:A


个人承担风险的意愿是取决于 ( )

A.决策树模型

B.蒙特卡罗方法

C.敏感分析

D.效用功能

正确答案:D


136 Historical records during close-out are useful to _____ and _____ for future projects.

A. Predict trends, highlight problems.

B. Analyze successes, shortfalls.

C. Analyze strengths, document results.

D. Support litigation, defend claims.

E. Justify results, set standards

正确答案:A


● The most frequently used construct in Precedent Diagramming Method is:

A Start to Start.

B Finish to Finish.

C Start to Finish.

D Finish to Start.

E Dummy activity.

正确答案:D


42 Which of the following is not an input to quality planning?

A. scope statement.

B. regulations.

C. work results.

D. standards.

E. quality policy.

正确答案:C


21年项目管理师考试答案5章 第5章


Using the WBS shown in the Special window, a typical work package would be:

ASoftware development

BSystems design

CCoding

DA, B, and C

ENone of the above.

正确答案:E


In which of the following organization(s) does the Functional Manager have the LEAST authority?

A . coordinator

B . weak matrix

C . strong matrix

D . functional

E . expediter

正确答案:C


运用下表,计算年金流出流量为$4,000三年后的现值(利率 10%/年)。

Normal 0 7.8 磅 0 2 false false false EN-US ZH-CN X-NONE 年度

$1在 10%的利率下现值

$1在 12%的利率下现值

1

0.909

0.893

2

0.826

0.797

3

0.751

0.712

4

0.683

0.636

a. -$9,608

b. -$7,206

c. _$9,944

d. $6,551

正确答案:C

年限

利息 10% (1+r) n的折现率

年均支出

现值

1

0.909

-$4,000.00

-$3,636.00

2

0.826

-$4,000.00

-$3,304.00

3

0.751

-$4,000.00

-$3,004.00

现值

-$9.944.00

也可以这样计算:

现值= -$4,000*(0.909+0.826+0.751) = - $9,944

或现值=$4,000*2.486(年金折现率)= - $9,994




A line manager provides you with three estimates for his activity in your PERT network. His estimates are 2 weeks optimistically, 4 weeks most likely, and 12 weeks pessimistically. The expected time which would appear on the chart would be:

A . 4 weeks

B . 5 weeks

C . 6 weeks

D . 7 weeks

E . None of the above.

正确答案:B


15 Which of the following is most closely associated with pure risk:

A. profit and loss

B. personnel turnover

C. insurance

D. market fluctuations

E. A and D only

正确答案:C